MAIN PAGE  |  ABOUT US  |  SYNDIS  |  PRODUCTS  |  TRAININGS  |  PARTNERS  |  NEWS  |  CONTACT    PL  |  EN  |  RU  |  DE   

Automation systems for mines

One of the most important systems in an opencast brown coal mines is a deep-drain system which enables lowering the level of groundwater in order to continue extracting the coal.
The deep-drain system consists of many deep-well pumps located ca. 200-300m underneath the surface of earth. They are installed in so-called frontier (around the opencast) and in the area of the opencast.

Exemplary installations:

Drain and Szczerów field automation – BOT KWB Bełchatów

Wysad Solny „Dębina” drain automation – BOT KWB Bełchatów

 

 
   Print    Send e-mail to us